Week 4: The Walls
29.06.2007
Week 4: June 25-29
Week 4 was the most productive week to date. The exterior walls are
have been erected and are ready for the roof to be put in next
week. The interior is also starting to take shape with the walls
being erected on the inside.
The building really starts to take shape as the walls are erected.
By the end of week 4 we are ready to begin the roof.